I am so distracted at home because I only think about cleaning, rearranging, and fixing up Fuller. After the two bathrooms are near completion, we have to be patient because we can't have two project houses. We need to focus on Logan so we can complete it and THEN devote our time to Fuller. As far as Logan is concerned, it has taken a backseat to this bathroom project. Everything is finally cleared out of the yard (so it doesn't look quite so trashy), but the inside still has debris that needs to be removed before framing/furnace can be started. Ugh. I am already ready to sell this project house and concentrate on Fuller!! Graduation is a month away- I can't wait until we can devote extensive time to Logan St so that we can finish it up and my updates aren't so redundant.
Thursday, November 19, 2009
Bathroom!
Fuller is a hot mess right now because our guest room (the lower floor bedroom) is full of bath fixtures (a tub, a sink vanity, and a toilet) and there is tiling equipment everywhere else. We have the roughed in plumbing (Rearranging the whole room's fixture), previous walls and fixtures removed, and the framing for our shower/drop in tub built thus far. I am so excited though because in a few days we will have a gorgeous tiled bathroom. Though we have been getting exceptional prices for labor, we have expensive taste (go figure) and have been choosing things based on (a) what we'll really like and (b) resale value. We are decorating this house on a different (and more fun) strategy than Logan.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment